Explore Hydro Innovations’ Range of Above-Ground Sewage Pump Stations
Above-Ground Sewage Pump Stations for Councils and Water Authorities
- Above-ground stations that remove confined space entry and cranes from routine maintenance
- Self-Cleaning Sump to stop rag, sediment, fat and grease build-up and the H2S that follows
- Larger flow or higher pressure from the existing wet well and rising main
- Emergency sewage bypass during power outages or equipment failure at the station
- Australian support from experienced pump specialists
How an above-ground station works
The pumps, valves and controls sit above ground. Sewage gravitates to the collection well as it does now, and the pumps draw from it through suction lines. The existing wet well is re-used and the new station’s discharge connects to the existing rising main.
Maintenance at ground level
Gorman-Rupp self-priming pumps are serviced at ground level safely by one operator using common hand tools, without disconnecting piping. Cranes, crane trucks and confined space equipment are not required for routine work.
The valve vault can be removed
Converting to an above-ground station allows the old valve vault to be decommissioned. That removes a second confined space from the site along with the entry procedure attached to it.
Preventing Concrete Cancer in Sewage Pump Stations
Concrete cancer in a sewage pump station is caused by hydrogen sulphide, and hydrogen sulphide is produced by organic material sitting still in the wet well. Removing the accumulation removes the source.
What happens in a conventional wet well
Solids and sediment settle at the bottom of the pit. Wipes, rags, ropes, plastics, and fat float and form a crust on the surface. Both layers stay in place and continue to build, with the pump between them.
Some wet wells, because of their size and low in-flow rates, remain stagnant for long periods of time.
The stagnant water can then turn septic and release hydrogen sulphide into the air space above the liquid. In the humid headspace it converts to sulphuric acid on the concrete above the waterline, which attacks the cover, exposes reinforcement, and eventually requires major remediation or replacement of the structure.
Keeping the sump serviceable in the meantime requires regular manual cleaning and removal of pumps from the well. That means dedicated technicians, lifting equipment, confined space procedures and often traffic management.
How the Self-Cleaning Sump prevents it
The Gorman-Rupp Self-Cleaning Sump [SCS] replaces the conventional cylindrical wet well with a sloping heavy-duty HDPE collector pipe connected directly to the control manhole. Paired with intelligent level controls, it maintains a flow velocity that pulls floating debris and surface crust down and passes it through on every pumping cycle.
The idea of the SCS is to keep pumping times long, and non-pumping times short. This enables the removal of almost all solids [debris, fat, sediment etc] with each cycle to eliminate blockages caused by the build-up of rags, sediment and stringy matter. Keeping non-pumping times short [because of the small size of the SCS] minimises the opportunity for stringy materials to mat together.
With less material standing in the well, less hydrogen sulphide is produced. Moving the pumps, motors and controls above ground also removes that equipment from the corrosive headspace, and removes the need to enter the well for routine cleaning.

Relining or replacing a wet well addresses the damage. Keeping the well “clean” addresses the cause. Where a station is already showing concrete cancer, the renewal is a practical point at which to review the system rather than rebuild the same arrangement.
Upgrading an Existing Sewage Pump Station
Network expansions and increased inflows often mean an existing pump station has to handle more than its original design capacity. In some cases, larger pumps are required, that are too big for the existing infrastructure. Changing to self-priming pumps could enable asset owners to re-use the existing infrastructure, delivering huge capital cost savings.
Larger flow, without digging a second wet well
When a submersible station upgrade requires a larger pump, the size of the wet well may not accommodate the larger pumps. The conventional answer is the construction of a new wet well, big enough to fit the larger pumps.
An option is to install Gorman-Rupp self-priming sewage pumps at ground level. The existing well will have plenty of room for this option, because only the suction lines are located in the wet well.
Increasing the flow will have the added complexity of increasing the total dynamic head [TDH] because of the increased friction. This often causes a problem with the “conventional” approach when the 2nd pump is also used as a lag pump to cover peak conditions. This is the ideal scenario for Gorman-Rupp’s “Series/Parallel” piping arrangement, where the 2nd pump automatically pumps in series with the lead pump.
Higher pressure, without adding another station
Some upgrades require additional head rather than additional volume, for example a rising main extended to a new connection point, or a transfer duty that was not in the original design.
Where a duty exceeds what a single-stage self-priming pump can produce, Gorman-Rupp’s Ultra V Series 2-Stage pumps can deliver pressures to 95 metres, or by adding further stages, can reach 160 metres. This additional pressure capability gives asset owners an option to pump longer distances to treatment plants or potentially get more flow through undersized rising mains.
Why Choose Our Sewage Pump Stations
No confined space entry for routine maintenance
Because all the mechanical and electrical equipment is mounted at ground level, there is no need to open wet-well covers that would expose operators to working at heights, working over water, or working in confined spaces.
No cranes needed and
no swinging loads
Pumps are not lifted out of a wet well, so no crane, lifting permit or certified operator is required before a blockage can be cleared.
Valve vault decommissioned
Converting to an above-ground station allows the old valve vault to be decommissioned, removing a second confined space from the site.
Quick and easy
servicing
Gorman-Rupp self-priming pumps have a removable cover plate for inspecting internals and clearing clogs using common hand tools, without disturbing suction or discharge piping.
Lower civil and
life cycle costs
Working within existing civil infrastructure avoids deep excavation and civil redesign. A well that stays clear also requires fewer attendances over the life of the asset.
5 year station warranty
Every ES packaged station carries a 5 year warranty covering the entire package system including controls, piping and valves. Gorman-Rupp compares this with the 12 month limited warranties offered on other pumps and pump stations.
Gorman-Rupp ES Sewage Pump Stations
ES Emergency Bypass Auto-Start Pump Units
Super T and Ultra V Sewage Pumps Pump no matter what the pump station fault Use instead of a power generator
ES 7×10 Lift Station
Self-priming Super T and Ultra V sewage pumps Roll-top roof for super easy access Lower life cycle costs
Gorman-Rupp ES 6x6T Pump Station
Super T and Ultra V sewage pumps Lower civil costs Greatly reduced WHS issues
Gorman-Rupp ES 6×6 Pump Station
Super T and Ultra V sewage pumps Above-ground pump station Compact design
Gorman-Rupp Base-Mounted Lift Stations
Super T and Ultra V Sewage Pumps Self-Priming pumps Reduce maintenance costs and improve safety
ES Auto-Start Self Priming Pump Station
Super T and Ultra V sewage pump station Electric-motor driven pumps, with… Auxiliary combustion engine drives pumps when power is not available
Hydro Innovations Self-Cleaning HDPE Sump for Wastewater Stations
Eliminate Blockages W/ The Easy To Install Sloping Collector Pipe
Emergency Sewage Bypass Pumping
Bypass pumping is a separate duty from running a station. When there is a power outage, or pumps or controls have failed at the station, Emergency Standby Pumps are called into action.
Instead of using a generator at the station, asset owners have the option of a permanently installed Emergency Standby Pump. Unlike a generator, the pump delivers flow, no matter what the problem at the station happens to be [liquid level control failure, controls failure, double pump blockage, or a power outage]. Super T and Ultra V Series pumps can be used for lower flow [below 215L/s] and lower head [below 95m]. For higher flows or pressures, Gorman-Rupp PAH [Prime assisted or dry prime] pumps can be used.
PA & PAH PrimeAssist Pumps: Peak Field Efficiency
Dirty water and wastewater pump Compressor/venturi or diaphragm pump priming system Suitable for long suction lines and/or operating on “snore”
Super T And Ultra V Series
Super T and Ultra V Self-Priming sewage pump models for emergency bypass operations have the following features.
PAH Series
Prime Aire Plus. Higher head and higher flow for the largest bypass duties
Maximum capacity and maximum head are separate limits across each series, not a single duty point. The highest flow and the highest head are achieved by different models, so selection is made against your specific duty.
- Field-adjustable running clearances, so efficiency is restored on site rather than in a workshop
- Skid or trailer mounted, engine driven or bare shaft
- Patented external shim-less impeller clearance adjustment
- Multiple engine brands available
- Double lip seal arrangement protecting the bearings and shaft
- Material options for abrasive or corrosive liquids
- Acoustically rated enclosures to meet site requirements.
Frequently Asked Questions
How do you prevent concrete cancer, rather than just repair it?
Concrete cancer is caused by hydrogen sulphide, which is produced by organic material sitting still and going septic in the wet well: the sludge bed on the floor and the crust of wipes and grease on the surface. The Self-Cleaning Sump replaces the cylindrical wet well with a sloping HDPE collector and, paired with intelligent level controls, maintains a flow velocity that pulls floating debris and surface crust down and passes it through on every cycle. With less material standing in the well, less hydrogen sulphide is produced. Moving the pumps and controls above ground also removes that equipment from the headspace.
Do we have to build a new pump station?
In most cases, no. Converting to an above-ground station re-uses the existing wet well and connects the new station's discharge to the existing rising main. The submersible pumps are removed, new suction piping runs from ground level into the wet well, and the old valve vault can be decommissioned. This avoids the civil redesign and extended outage associated with a conventional station replacement.
Can we increase to a larger flow without a second wet well?
In many cases yes. Because an ES station pumps from above ground, additional capacity can be added by running another suction line from the existing collection well and adding pumping capacity at the surface, rather than excavating. Stations can also be configured as a Gorman-Rupp Parallel/Series system, which runs one pump for average flows and shifts automatically into series operation when flows exceed single pump capability.
What if we need higher pressure than our current pumps deliver?
ES Base-Mounted and Auto-Start stations cover heads to 98 m as standard. Where a duty needs higher pressure than a single-stage self-priming pump will deliver, an UltraMate unit connects directly to an Ultra V Series pump through a transition chamber. Gorman-Rupp rates that combination at up to three times the pressure of a traditional single-stage solids-handling self-priming pump, and up to 60% increased flow. The staged arrangement is called the VS Series.
Will our operators still need to enter the wet well?
Not for routine pump maintenance, and not for routine manual wet well cleaning, which the self-cleaning action is designed to eliminate. Pumps, valves and controls sit at ground level, and the old valve vault is decommissioned as part of the conversion. The collection well remains a confined space under your WHS obligations if anyone ever does need to enter it. The change is that routine work no longer puts anyone in there.
What happens during a power outage?
On an ES Auto-Start station, when the power fails and the electric motor stops, rising liquid levels trigger a control that automatically converts the unit to 12 volt DC. A standby engine drives the pump during the outage, and AC motor operation is automatically restored when power resumes. Alternatively, an ES Emergency Bypass Auto-Start unit sits alongside an existing station on independent level control and takes over on power failure, panel failure or pump failure, with no changes to your existing control panel.
Will an above-ground station suit every site?
Not every site. The governing constraint is static suction lift and NPSH available at the lowest operating level in the well, so suction line size and length matter, and excessively long suction lines are avoided. Send us the invert levels, the drawdown range, your design flows and the rising main details and we will check it before quoting. If it is not suitable we will tell you.
Contact Form
Our Team is available to answer your pump query within the hour.
21-23 Clyde Street,
Rydalmere NSW 2116






